
Base Rate Roll-up
This calculator accumulates the Initial Amount paid at Start Date to the End Date assuming compound returns equal to the Bank of England’s base rate applying over the period. Rates used are BoE base rates from 20 January 1975 to date.
Accumulated value (£) | ||
Date | Accumulated value at date | Annual rate |